AMT Pro Datasheet — A4 front/back

Same family layout as the e-MCM datasheet. Front: product and diagnostic capabilities. Back: service cases (13 Mediochiampo pumps + 30 Verallia fans).

Page 1 — Front
ArtesisITALIA
AMT Pro System · Portable diagnostic tester

No disassembly. No downtime. In 7 minutes.

The AMT Pro is a portable tester for condition monitoring of three-phase AC motors and generators. It connects to the electrical panel, acquires the electrical signature in 7 minutes, and automatically generates a complete diagnostic report — with estimated time to failure, prioritised corrective actions, and quantified energy waste. A full motor/generator fleet audit in minimal time.

10M+
motors in dataset · 25 years of electrical signature
7 min
per complete test with automatic report
10+
tests per field audit day
How it works — AMT Pro connects to the MCC panel, not to the machine
AC Motor
any size or manufacturer
→
MCC Panel
current clamps + voltage probes
→
AMT Pro
acquisition + on-board AI · 7 min
→
Immediate result
Diagnostic report
colour code + time to failure
→
Artesis Cloud
trend history · app + web
opt.

What it measures

  • Voltages Vr, Vs, Vt and currents Ir, Is, It
  • Supply frequency and actual rotation speed
  • Imbalance in voltage and current
  • Load and power factor (cos φ)
  • Active and reactive power
  • Harmonics in current, voltage and total (THD-I · THD-V)
  • PSD (power spectral density)
  • Instantaneous operating efficiency
From a single voltage and current acquisition at the panel, without physical access to the machine.

What it detects

  • Loose baseframe and soft-foot
  • Mechanical imbalance and misalignment
  • Drivetrain: belts, gearboxes, couplings
  • Rolling bearings (BPFO, BPFI, BSF, FTF)
  • Rotor: broken bars, eccentricity
  • Stator: windings, insulation
  • Cavitation, turbulence, off-BEP operation
  • Over/under-sized motors
9 fault categories covered. Automatic report with colour code and estimated time to failure.

Where it excels

  • Submersible pumps and deep wells (no physical access)
  • Fan campaigns · rapid audits on large fleets
  • Motors in ATEX zones — no sensors to install
  • Assets already in service, no unplanned downtime
  • VFDs and direct-on-line starts
  • AC generators up to medium voltage
  • Any manufacturer, any frame size
Compatible with fixed- and variable-speed three-phase AC motors, from MCC panel or terminal board.
AMT Pro measuring in the field, connected to the panel with test clamps Technician performing an AMT Pro test at the electrical panel during an audit
Monitored applications
Pumps
Fans
Conveyors
Compressors
Mixers
AHU
Generators
Subm. Pumps
Measure it. Report it. Fix it.
artesisitalia.it
Page 2 — Back
Italian Cases · 2024–2026

When the AMT Pro is switched on,
faults stop hiding.

Two real campaigns
analysed with
AMT Pro system
Water · Water Utility

13 submersible + surface pumps
Veneto water utility

Veneto · 6 sites · 18 to 75 kW · well lifting, civil and industrial booster stations.
47,700 kWh
excess consumption/year
= ~€7,160/year overspend
The challenge — The diagnosis — The result
Submersible pumps at the Veneto water utility
What we found
No imminent electrical faults. All critical issues are mechanical/hydraulic: active cavitation on 3 pumps, bearing signature present across nearly the entire fleet. One pump running continuously at 59% of BEP — clear sign of oversizing. One urgent case: motor at 110% of nameplate load.
What the client did
Prioritised intervention plan: planned shutdown on the overloaded pump, targeted inspection where cavitation is active, impeller trimming where the pump is oversized. Repeat measurements at 6 months to distinguish real degradation from off-BEP operating signature.
Glass · Industry

15 fans
in 1 day
major glass group

Leading Italian glass group · IS cooling, pallets, electrostatic filter stacks · motors from 30 to 315 kW · AMT Pro combined with industrial thermography.
€54K
annual energy overspend
identified · 77 t CO₂ avoidable/year
The challenge — The diagnosis — The result
Verallia industrial fans
What we found
One-day audit: AMT Pro electrical signature + thermography for dual evidence of incipient faults. Detected degraded bearings, imbalances and coupling issues on multiple machines. Thermography confirmed the thermal anomalies on components already identified electrically.
What the client did
Structured maintenance plan based on measured evidence, not a fixed calendar. Priority given to interventions with the highest energy impact: quantified waste alone exceeds €54,000/year. Expected reduction of 77 tonnes CO₂ equivalent/year.
1

Big Data 10M+

25 years of electrical signatures benchmarked.

2

Instant Report

Automatic diagnosis generated on-board in 7 minutes.

3

Algorithm + Report

Time-to-failure estimate and prioritised action plan.

Also as a Service

On-site diagnostic check-up. One day at your plant, full technical report. No upfront investment.

Chrome opens the print dialog —
choose Save as PDF